Let's hear some updates!
Moderator: carlson1
-
- Junior Member
- Posts in topic: 3
- Posts: 8
- Joined: Sat Jan 19, 2008 11:48 am
- Location: Austin, TX
- Contact:
Re: Let's hear some updates!
1/19/08 Completed the online application process and paid by Credit Card
1/24/08 DPS Mailed my app
1/26/08 I received app at my house
3/15/08 Took the class at Reds South in Austin
3/17/08 Hand carried the paperwork to DPS (I just work 2 block from there)
***Sorry did't log when online changed to "packet received" and "processing applicaton" but it was several weeks****
5/31/08 Status Changed to "Application Completed - license issued or certificate active"
Mine was a clean app - meaning to say no past record and I didn't have to go back and submit any extra documents.
I never called DPS to check on my status either. Just watched my status online.
I believe it was on about day 75 after hand delivering the packet that the online status changed to "Application Completed - License issued or certificate active"
Today is Saturday - Guess I'll be camping out next to the mailbox today....
Plastic 6/4/08
CZ 75B .40
CZ 2075 Rami .40
Ruger .41 Blackhawk
etc...
etc...
CZ 75B .40
CZ 2075 Rami .40
Ruger .41 Blackhawk
etc...
etc...
Re: Let's hear some updates!
That makes me feel better. I hand delivered mine 7 days after aandpman. Ill keep my fingers crossed and hope for the best.
Grapeno1
Grapeno1
02 Mar: Applied online
10 Mar: Recieved packet/Pin Number
24 Mar: Hand Delivered packet
22 Apr to Present: "Processing Application"
31 May: "Application Completed - license issued or certificate active"
04 June: Plastic in Hand.
10 Mar: Recieved packet/Pin Number
24 Mar: Hand Delivered packet
22 Apr to Present: "Processing Application"
31 May: "Application Completed - license issued or certificate active"
04 June: Plastic in Hand.
Re: Let's hear some updates!
Just checked my status and :
Application Completed - license issued or certificate active.
Happy days are here again,
Now just waiting on the mail.
Grapeno1
Last edited by grapeno1 on Sat May 31, 2008 10:12 am, edited 1 time in total.
02 Mar: Applied online
10 Mar: Recieved packet/Pin Number
24 Mar: Hand Delivered packet
22 Apr to Present: "Processing Application"
31 May: "Application Completed - license issued or certificate active"
04 June: Plastic in Hand.
10 Mar: Recieved packet/Pin Number
24 Mar: Hand Delivered packet
22 Apr to Present: "Processing Application"
31 May: "Application Completed - license issued or certificate active"
04 June: Plastic in Hand.
-
- Senior Member
- Posts in topic: 4
- Posts: 2115
- Joined: Mon Nov 19, 2007 5:24 pm
- Location: Marshall
Re: Let's hear some updates!
That wait for the mail is probably the hardest part.
NRA lifetime member
-
- Senior Member
- Posts in topic: 7
- Posts: 580
- Joined: Mon Mar 31, 2008 10:15 pm
- Location: near Democrat, TX
Re: Let's hear some updates!
new udate:
We (both wife and I) Got an "issued" on the dps website.....in the mail soon....Yeah!!
rob02262008, you were correct....90 days to issue!
Thanks to all for all of the info and support.....Now, just a mail delay and a WaleyWalk.
chl class = March 1
mailed apps = March 3
received pin = May 23
says license issued on website = May 31.......IN THE MAIL....COMING SOON!
We (both wife and I) Got an "issued" on the dps website.....in the mail soon....Yeah!!
rob02262008, you were correct....90 days to issue!
Thanks to all for all of the info and support.....Now, just a mail delay and a WaleyWalk.
chl class = March 1
mailed apps = March 3
received pin = May 23
says license issued on website = May 31.......IN THE MAIL....COMING SOON!
Life member NRA and TSRA
-
- Senior Member
- Posts in topic: 6
- Posts: 396
- Joined: Thu Mar 06, 2008 11:06 pm
- Location: Marion
Re: Let's hear some updates!
Congrats, riverrat. I am hoping for 90 days but not honestly expecting it. Good luck with your wally walk.RiverRat wrote:new udate:
We (both wife and I) Got an "issued" on the dps website.....in the mail soon....Yeah!!
rob02262008, you were correct....90 days to issue!
Thanks to all for all of the info and support.....Now, just a mail delay and a WaleyWalk.
chl class = March 1
mailed apps = March 3
received pin = May 23
says license issued on website = May 31.......IN THE MAIL....COMING SOON!
NRA Endowment Member
TSRA Member
TSRA Member
-
- Member
- Posts in topic: 17
- Posts: 130
- Joined: Sun Nov 19, 2006 6:06 pm
- Location: College Station, Texas
Re: Let's hear some updates!
HELL YES!!! MY CHL IS NOW ACTIVE!
I almost didnt' check it today since it's a Sunday any nothing ever happens in .gov in Sunday but I did and it shows "Application Completed - license issued or certificate active."
62 days since they opened my packet and cashed my check... looking at 67-69 days door to door (however long it takes to mail from Austin to College Station).
To be honest, I wouldn't feel any different when I recieve it as I have been carrying without the plastic...but I'll be comforted that I'll be legal now.
Now if only my dealer would call me tomorrow and say that my Form 4 has been approved for my AAC M4-2000 and I recieve an approved Form 1 for my SBR....it would be a perfect world.
I almost didnt' check it today since it's a Sunday any nothing ever happens in .gov in Sunday but I did and it shows "Application Completed - license issued or certificate active."
62 days since they opened my packet and cashed my check... looking at 67-69 days door to door (however long it takes to mail from Austin to College Station).
To be honest, I wouldn't feel any different when I recieve it as I have been carrying without the plastic...but I'll be comforted that I'll be legal now.
Now if only my dealer would call me tomorrow and say that my Form 4 has been approved for my AAC M4-2000 and I recieve an approved Form 1 for my SBR....it would be a perfect world.
CHL Class taken: 3/5/08
CHL Packet Sent: 3/24/08
CHL Packet Recieved by DPS: 3/25/08
Check Cleared: 4/1/08
PIN Number Recieved: 4/12/08
CHL Licence Issued/Active: 6/1/08
In the mailbox: 6/5/08
72 days.
1st Renewal
Online app.: 1/3/13
Class: 1/27/13
Mailed: 1/28/13
Paperwork received: 1/31/13
CHL Packet Sent: 3/24/08
CHL Packet Recieved by DPS: 3/25/08
Check Cleared: 4/1/08
PIN Number Recieved: 4/12/08
CHL Licence Issued/Active: 6/1/08
In the mailbox: 6/5/08
72 days.
1st Renewal
Online app.: 1/3/13
Class: 1/27/13
Mailed: 1/28/13
Paperwork received: 1/31/13
Re: Let's hear some updates!
Feb 23 Took class
Feb 25 Mailed application
Feb 27 DPS received application
March Status changed to "Processing Application"
May 27 - 90th day Status still "Processing Application"
June 2 - Application Completed - license issued or certificate active
I can't believe it. I think somehow when your mind finally gives up on ever getting the CHL the DPS finds out and issues the license.
Feb 25 Mailed application
Feb 27 DPS received application
March Status changed to "Processing Application"
May 27 - 90th day Status still "Processing Application"
June 2 - Application Completed - license issued or certificate active
I can't believe it. I think somehow when your mind finally gives up on ever getting the CHL the DPS finds out and issues the license.
-
- Member
- Posts in topic: 21
- Posts: 54
- Joined: Tue May 13, 2008 2:32 pm
- Location: Canyon Lake, TX
- Contact:
Re: Let's hear some updates!
darn. mine still say "processing".
Edward
took class on 2-16 perfect score on written and shooting
mailed off 2-28
DPS officially received 3-6-08 add 60 days = 5-6-08
Got my PIN letter on 3-18
got plastic on 6-9
94 days total.geez
HARDWARE
Glock 22 nite sights
springco recoil reducer
hogue grips
3.5 lb connector.
took class on 2-16 perfect score on written and shooting
mailed off 2-28
DPS officially received 3-6-08 add 60 days = 5-6-08
Got my PIN letter on 3-18
got plastic on 6-9
94 days total.geez
HARDWARE
Glock 22 nite sights
springco recoil reducer
hogue grips
3.5 lb connector.
-
- Member
- Posts in topic: 17
- Posts: 130
- Joined: Sun Nov 19, 2006 6:06 pm
- Location: College Station, Texas
Re: Let's hear some updates!
mondo2000 wrote:Feb 23 Took class
Feb 25 Mailed application
Feb 27 DPS received application
March Status changed to "Processing Application"
May 27 - 90th day Status still "Processing Application"
June 2 - Application Completed - license issued or certificate active
I can't believe it. I think somehow when your mind finally gives up on ever getting the CHL the DPS finds out and issues the license.
You gotta keep your expectations low.
I had already resigned myself to waiting 90 days because of all the horror stories.
And then, just after after 62 days, the license got approved.
CHL Class taken: 3/5/08
CHL Packet Sent: 3/24/08
CHL Packet Recieved by DPS: 3/25/08
Check Cleared: 4/1/08
PIN Number Recieved: 4/12/08
CHL Licence Issued/Active: 6/1/08
In the mailbox: 6/5/08
72 days.
1st Renewal
Online app.: 1/3/13
Class: 1/27/13
Mailed: 1/28/13
Paperwork received: 1/31/13
CHL Packet Sent: 3/24/08
CHL Packet Recieved by DPS: 3/25/08
Check Cleared: 4/1/08
PIN Number Recieved: 4/12/08
CHL Licence Issued/Active: 6/1/08
In the mailbox: 6/5/08
72 days.
1st Renewal
Online app.: 1/3/13
Class: 1/27/13
Mailed: 1/28/13
Paperwork received: 1/31/13
Re: Let's hear some updates!
I imagine mine will just show up one day without any indication, hahah!
KIMBER SST UCII
NRA/HCA MEMBER
4/22/08 PACKET AT DPS
5/15/08 PIN, PACKET MAILED TO APPLICANT
5/22/08 EMAILED DPS
6/10/08 EMAILED REPRESENTATIVE
6/11/08 PROCESSING APPLICATION
7/03/08 APPLICATION COMPLETED - LICENSE ISSUED OR CERTIFICATE ACTIVE
7/10/08 PLASTIC IN HAND! 80 DAYS
NRA/HCA MEMBER
4/22/08 PACKET AT DPS
5/15/08 PIN, PACKET MAILED TO APPLICANT
5/22/08 EMAILED DPS
6/10/08 EMAILED REPRESENTATIVE
6/11/08 PROCESSING APPLICATION
7/03/08 APPLICATION COMPLETED - LICENSE ISSUED OR CERTIFICATE ACTIVE
7/10/08 PLASTIC IN HAND! 80 DAYS
-
- Member
- Posts in topic: 21
- Posts: 54
- Joined: Tue May 13, 2008 2:32 pm
- Location: Canyon Lake, TX
- Contact:
Re: Let's hear some updates!
87 days for me.....
Edward
took class on 2-16 perfect score on written and shooting
mailed off 2-28
DPS officially received 3-6-08 add 60 days = 5-6-08
Got my PIN letter on 3-18
got plastic on 6-9
94 days total.geez
HARDWARE
Glock 22 nite sights
springco recoil reducer
hogue grips
3.5 lb connector.
took class on 2-16 perfect score on written and shooting
mailed off 2-28
DPS officially received 3-6-08 add 60 days = 5-6-08
Got my PIN letter on 3-18
got plastic on 6-9
94 days total.geez
HARDWARE
Glock 22 nite sights
springco recoil reducer
hogue grips
3.5 lb connector.
Re: Let's hear some updates!
73 days no PIN no nothing.
I just sent an email this morning to get the status of my application, no reply as of 2:26 pm.
I just sent an email this morning to get the status of my application, no reply as of 2:26 pm.
Re: Let's hear some updates!
Feb 23 Took class
Feb 25 Mailed application
Feb 27 DPS received application
March Status changed to "Processing Application"
May 27 - 90th day Status still "Processing Application"
June 2 - Application Completed - license issued or certificate active
June 2 - Came home and there was a UPS package from Austin. My CHL was inside!
Feb 25 Mailed application
Feb 27 DPS received application
March Status changed to "Processing Application"
May 27 - 90th day Status still "Processing Application"
June 2 - Application Completed - license issued or certificate active
June 2 - Came home and there was a UPS package from Austin. My CHL was inside!
-
- Member
- Posts in topic: 21
- Posts: 54
- Joined: Tue May 13, 2008 2:32 pm
- Location: Canyon Lake, TX
- Contact:
Re: Let's hear some updates!
what??!? really? via UPS. not USPS? hmmmmm. that's weird. anyone else experience this?
Edward
took class on 2-16 perfect score on written and shooting
mailed off 2-28
DPS officially received 3-6-08 add 60 days = 5-6-08
Got my PIN letter on 3-18
got plastic on 6-9
94 days total.geez
HARDWARE
Glock 22 nite sights
springco recoil reducer
hogue grips
3.5 lb connector.
took class on 2-16 perfect score on written and shooting
mailed off 2-28
DPS officially received 3-6-08 add 60 days = 5-6-08
Got my PIN letter on 3-18
got plastic on 6-9
94 days total.geez
HARDWARE
Glock 22 nite sights
springco recoil reducer
hogue grips
3.5 lb connector.